Current Projects

Hull 34  Hull 35  Hull 36

Past Projects    Drilling Support Projects 

Salvage Work at Oroville Dam

Dec 2016 the shipyard is full and busy

Feb 2016

Feb 2016 - Seatrials"Lucy Franco"

Feb 2016 - Finishing touches on repower and refurbish of "Lucy Franco"

Jan 2015 - Equipment Support at Ridgefield Lake River Dredging Project

Nov 2014 - Equipment Support at Ridgefield Lake River Dredging Project

 

Oct  2014 - Pontoon float out

Sept  2014 - Drydock "Joseph Sause"

Sept  2014 - Drill Support Work for Hardcore Drilling

July 2014 - Bridge Inspection

April 2014 -Graving dock in Aberdeen ZD2 and Lynx

Feb 2014 - Drydock "Henry Brusco"

Jan 2014 - Launch services with "Sandwick"

Oct  2013 - Hauling Contractor Equipment

July  2013 - Drill Support Work

 

July  2013 - Canby Ferry Repower

 

Feb  2013 - Port of Portland's Tug "Clackamas"

Jan 2013 - Repower Canby Ferry

Aug 2012 - Drilling support for Cascade Drilling

Aug 2012 - Drydocking "Williams" for Port of Portland

July 2012 - Lynx at Aberdeen moving floating bridge pieces

Link for time lapse video of the float out of bridge pieces

July 2012 - The truckable, shallow draft  "Lynx" on its way to work in a graving dock

June 2012 - Drilling support project on Columbia River

May 2012 - Brusco's "Arthur Brusco" sliding into the drydock

May 2012 - Drydock for Foss Maritime Tug "Daniel Foss"

April 2012 - Drydock for Port of Portland Tug "Clackamas"